SPECIAL TOWN MEETING - VIDEO/ONLINE STREAMING INFO »
The Special Town Meeting taking place on Tuesday, November 12th, 2024 starting at 6:30 pm will NOT be...
Special Town Meeting Warrant & Explanation of Articles »
The Special Town Meeting Warrant and Explanation of Warrant Articles are attached. The meeting will be held on Tuesday...
Senior Center Building Committee Public Forum - Video and Powerpoint presentation online »
Senior Center Building Committee Public Forum
https...
Upcoming Events
2022 Approved Construction Projects
Old Coach Circle - Mill and Pave
2021 Construction Projects
Kelly Lane - Mill and Pave
Location: From Wilbraham Road to End
Length and Width: 1,848 feet X 26 feet = 5,339 sy plus TA 1,256 sy = 6,595 sy
Scope of Work: Check and replace/adjust 10 catch basins tops as needed. Mill roadway. Apply SAMI Treatment, then 1.5 inches top course. Adjust lawns and driveways.
North Road - Berm and Overlay
Location: From #192 to #298
Length and Width: 1,900 feet X 22 feet = 4,644 sy
Scope of Work: Replace/adjust existing catch basin tops as needed. Widen roadway. Apply leveling course. Install berm as needed. Apply 1.5 inches bituminous concrete. Adjust lawns and driveways.
South Monson Road – Mill and Pave
Location: From Scantic Road to Highland Circle
Length and Width: 6,700 feet X 26 feet = 19,355 sy
Scope of Work: Check and repair catch basins and tops as needed. Mill 1.5 inches. Pave 1.5 inches Adjust lawns and driveways as needed
Allen Street - Mill and Pave
Location: From East Longmeadow town line to Circle View Drive
Length and Width: 3,585 feet X 26 feet = 10,357 sy
Scope of Work: Check and repair catch basins and tops as needed. Mill 2 inches off entire roadway. Pave 2 inches. Adjust lawns and driveways as needed.
Country Club Drive - Mill and Pave
Location: From Main Street to End
Length and Width: 1,162 feet X 26 feet = 3,357 sy plus 1,256sy TA = 4,613sy
Scope of Work: Check and replace/adjust 10 catch basins tops as needed. Mill roadway. Apply SAMI Treatment then 1.5 inches top course. Adjust lawns and driveways.
2020 Construction Projects
Pondview Drive Reclaim and Pave
Location: From Wilbraham Road to Springhouse Road
Length and Width: 2,022 feet X 30 Feet = 6,740 sy
Scope of Work: Check and replace catch basins and tops as needed. Lower all structures. Reclaim roadway and berms. Grade and compact. Install base, raise structures, berm, then top course. Adjust lawns and driveways.
Maple Grove Road Reclaim and Pave
Location: From Pondview Drive to Springhouse Road
Length and Width: 900 feet X 30 feet = 3,000 sy
Scope of Work: Check and replace catch basins and tops as needed. Lower all structures. Reclaim roadway and berms. Grade and compact. Install base, raise structures, berm, then top course. Adjust lawns and driveways.
Springhouse Road Reclaim and Pave
Location: From Maple Grove Road to End
Length and Width: 1000 feet X 30 feet = 3,333 sy
Scope of Work: Check and replace catch basins and tops as needed. Lower all structures. Reclaim roadway and berms. Grade and compact. Install base, raise structures, berm, then top course. Adjust lawns and driveways.
Perennial Lane Reclaim and Pave
Location: From Wilbraham Road to End
Length and Width: 630 feet X 28 feet = 1,960 sy plus TA 1,055 sy = 3,015 sy
Scope of Work: Check and replace catch basins and tops as needed. Lower all structures. Reclaim roadway and berms. Grade and compact. Install base, raise structures, berm, then top course. Adjust lawns and driveways.
2019 Construction Projects
Wilbraham Road - Construction and Paving
Location: From Allen Street to Raymond Drive.
Scope of Work: Lower structures. Reclaim entire roadway. Grade, calcium, compact. Pave binder. Raise structures. Install berms. Pave top course. Adjust/Repair lawns and driveways. Paint traffic lines.
Scheduled for late July-early August. This section of Wilbraham Road will be closed to through traffic. Please expect a minor detour during road construction and paving.
North Road – Construction and Paving
Location: From Mountain Road to 2,800 ft.
Scope of Work: Lower structures. Reclaim entire roadway. Grade, calcium, compact. Pave binder. Raise structures. Install berms. Pave top course. Adjust/Repair lawns and driveways.
Scheduled for late July-early August. Please expect minor delays as this section of North Road will be reduced to one lane of traffic during construction and paving. This will be the first of several phases to upgrade North Road.
Office | Phone | Hours |
---|---|---|
Board of Assessors | (413) 566-2151 (ext. 106) | Monday - Thursday: 9:00 am - 2:00 pm |
Board of Health | (413) 566-2151 (ext. 102) | Monday - Thursday: 7:30 am - 3:00 pm |
(413) 566-2151 (ext. 100) | Monday - Thursday: 9:00 am - 4:00 pm | |
Building Department | (413) 566-2151 (ext. 107) | Monday - Thursday: 8:30 am - 12:00 pm |
Cemetery Commission | (413) 566-2151 (ext. 111) | Monday - Thursday: 12:30pm - 4:30pm |
Conservation Commission | (413) 566-2151 (ext. 110) | Monday - Thursday: 8:00 am - 12:00 pm |
Highway Department | (413) 566-8842 | Monday - Friday: 7:00 am - 3:30 pm |
Parks & Recreation | (413) 566-2151 (ext. 108) | Monday - Thursday: 7:30 am - 2:00 pm |
Planning Board | (413) 566-2151 (ext. 109) | Monday - Thursday: 9:30 am - 1:30 pm |
Police Department | (413) 566-8011 | 24/7 |
Public Library | (413) 566-2151 (ext.112) | Monday, Tuesday & Wednesday: 10:00 am - 5:00 pm Thursday: 1:00 pm - 8:00 pm Saturday: 10:00 am - 2:00 pm |
Public Records Officer | (413) 566-2151 (ext. 103) | Monday - Thursday: 9:00 am - 3:00 pm |
Senior Center | (413) 566-5588 | Monday - Friday: 9:00 am - 3:00 pm |
Tax Collector | (413) 566-2151 (ext. 104) | Monday - Thursday: 9:00 am - 3:00 pm or by appointment |
Town Administrator | (413) 566-2151 (ext. 118) | Monday & Tuesday 8:30am - 3:30pm Wednesday 8:30M - 2:30PM |
Town Clerk | (413) 566-2151 (ext. 103) | Monday - Thursday: 9:00 am - 3:00 pm |
Town Treasurer | (413) 566-2151 (ext. 120) | Tuesday - Thursday: 11:00 am - 2:00 pm and by appointment |
Tree Warden | (413) 566-3496 | |
Volunteer Fire Department | (413) 566-3314 | 24/7 |